Case #2 -- Constrained
E
A
B
C
D
Solitude
Alta
Park City
Brighton
Sundance
*
Previous slide
Next slide
Back to first slide
View graphic version
Notes:
Now, let’s look at a constrained case.
Each of our loads have increased from 223 MW to 300 MW, for a total load of 900 MW.
The bids from each of our five generating resources are the same.