Case #1 - Unconstrained
Notes:
- What are the LMPs for this unconstrained case?
- Remember, in an unconstrained system the location marginal price is equal to the bid price of the last unit used to meet load.
- In this case the Alta unit, with a bid price of $14/MWh, is the marginal unit. Therefore, the LMPs at all buses are $14.