Case #1 - Unconstrained
Notes:
- Now let’s look at how we serve the 669 MW load with this available generation.
- Remember, generators are dispatched to meet load in order of the bids, beginning with the least expensive unit.
- Our most least expensive unit is the Brighton unit at a bid of $10/MWh. But the available capacity at Brighton is not enough to meet 669 MW of load.
- Our next most least expensive unit is the Alta unit at $14/MWh. So we dispatch 69 MW from the Alta unit, in addition to the 600 MW from Brighton.